Client

AECOM

Services

Project Controls Support Services

Project Description

The project consists of the construction of a 3,166-foot long Taxilane to connect Taxiway 'C' on the south and Taxiway 'D' on the north. Taxilane 'T' will be constructed as part of a 300 ft. wide, concrete paved strip which will be the second part of the future Dual Taxilane/ Taxiway System replacing existing Taxiways 'Q' and 'S', west of reconfigured Tom Bradley International Terminal (TBIT).

Project Highlights

  • Construct 3,166 foot long taxilane, connecting Taxiway "C" on the south and Taxiway "D" on the north.
  • 105,000 square yards of pavement, 300 feet wide
  • Grading, utilities, airfield signage & lighting
  • Taxilane "T" Service Road
  • Relocation of in-ground fuel lines
  • LAWA power and communication duct-banks
  • LADWP power duct-banks